O-Bahn Tunnel

Architect: JPE
Builder: Mc Connell Dowell
Commissioned: 2017
Scope of Works:
Shield Fire Systems was contracted to design, manufacture, install, test and commission the fire protection services for the 670m long, DPTI Bus Tunnel.