Metcash Distribution Centre, Gepps Cross

Architect: INTRO
Builder: Ahrens
Commissioned: 2020
Scope of Works:
Shield Fire Systems was contracted to design, manufacture, install, test and commission the fire protection services for this 74,000 m2 storage and distribution facility.